Here is the latest status on the AAVSOnet sites. Not much has changed on the software/pipeline side of things.
BSM_Berry. Operational.
BSM_Hamren. Still down. Someone needs to go to Hawaii and finish the re-commissioning.
BSM_NH. Operational.
BSM_NM. Operational, though we're working on an issue with autofocus.
BSM_S. Commissioning phase. Peter Nelson has everything installed in the new dome, and we're able to take images. There is a small amount of configuration to be done, but it should be back on-air shortly.
BSM_TX. Operational.
MPO61. Operational.
OC61. The refurbishment equipment has been shipped. This includes a QHY600 camera and filter wheel, a new computer, a new webcam, and a new mount controller. It will be a few weeks before everything is installed.
TMO61. Operational.